City Standards Manual
The instructions and directives included in this manual cover the design and construction of streets, alleys, water facilities and sanitary sewer facilities. The City of Monticello is responsible for these and issues this manual as a guideline. The purpose of these Standards is to establish a minimum criterion for design and workmanship.Please Note: The City of Monticello, Indiana reserves the right to add/modify/revise/delete standards and specifications at any time and that project specific specifications, to publicly bid projects, in conflict with city standards shall be brought to the attention of the City Engineer, Public Works Director, or relevant Project Manager.
Instructions: Please click on any of the sections below to review. The top link is the entire manual.
City Standards Manual
- CDC (Fed. Govt.) - Use of Cloth Face Coverings/DIY Instructions
- Monticello City Standards Manual (Complete 12mB)
- Sect 01 Introduction
- Sect 02 Definitions & Terms
- Sect 03 General Rules & Requirements
- Sect 04 Sanitary Sewer Design Standards
- Sect 05 Sanitary Sewer Materials
- Sect 06 Sanitary Lift Stations
- Sect 07 Sanitary Sewer Installation and Construction
- Sect 08 Sanitary Sewer Inspection, Testing & Acceptance
- Sect 09 Sanitary Sewer and Manhole Rehab CIPP
- Sect 10 SS Figures S 1 to S 22
- Sect 10 Sanitary Sewer Cleaning and CCTV Inspections
- Sect 11 Stormwater Hydrology
- Sect 12 Storm Sewer Design
- Sect 13 Storm Sewer Materials
- Sect 14 Storm Sewer Installation and Construction
- Sect 15 Open Channel Design Standard and Specifications
- Sect 16 Stormwater Detention Design Standards
- Sect 17 ST Figures ST 1 to ST 10
- Sect 17 Storm Sewer Inspection, Testing, and Acceptance
- Sect 18 Water Projects Design Standards & Details
- Sect 19 Water Project Materials
- Sect 20 Water Project Installation and Construction
- Sect 21 Water Project Inspection, Testing & Acceptance
- Sect 21 WP Figures W 1 to W 9
- Sect 22 Public Streets & Alleys Design Standards & Details
- Sect 23 Public Street & Alley Materials
- Sect 24 Public Street & Alley Installation and Construction
- Sect 25 Public Street & Alley Inspection, Testing & Acceptance
- Sect 26 Restoration of Surfaces
- Sect 27 Erosion Control
- Sect 27 PS Figures PS 1 to PS 31
- WCHD - Second Case of COVID-19 in White County